ASME QAl-1:2005 pdf free download.Qualifications for Authorized lnspection.
1-2.2 Duties
The Authorized Nuclear Inspector Supervisor shall perform the duties specified in 1-221 through 1-2.2.10.
1-2.2.1 Maintain a record of Certificate Holders’ shop and field sites where Inspectors assigned to him by his Authorized Inspection Agency for supervision are performing Code inspection activities. He shall record the date of his visits to such locations when related to his assigned supervisory duties.
1.2.2.2 Maintain a record of those Authorized Nuclear Inspectors assigned to him and a description of their assignments.
1-2.2.3 Assist in maintaining the competency of the Authorized Nuclear Inspector through periodic arrangement of panel discussions of work-related topicwritten communications of unique problems and their solution; informal question and answer discussion sessions, and other means he deems suitable. The Supervisor shall maintain docunientation of such activities.
1-2.2.4 The Supervisor shall be responsible for the technical performance of the Authorized Nuclear Inspector(s) assigned to him. He shall report in writing to his management significant nooconlorming activities that are reported to him or that he has observed on the part of the Inspector, following full investigation of such activities.
1-2.2.5 Either establish, or have available to him, a system to record and limit his radiation expsure and that of the Inspectors assigned to him, This system shall be under the regulation of his employer, who shall ma intam an acceptable system of control.
1-2.2.6 Audit the performance of each Authorized Nuclear Inspector under his supervision on a planned and periodic basis. Each Authorized Nuclear Inspector actively engaged in Section III. Division I or 3, or both, Code inspection shall be audited at least twice a year at the shop or site to which he is assigned. When an Inspector is assigned to more than one shop or site at which Code activities are being performed, or have been performed since the previous audit, the Authorized Nuclear Inspector shall be audited at least once a year at each location. At the time of this audit, the Supervisor shall be accompanied by the Authorized Nuclear Inspector. The audit shall include, but not be limited to. a check that the duties listed under 1-3.2 are being performed. and a check of the following:
a) one item under construction or installation phase to ensure implementation of the Quality Assurance Program.